1. Demand Confirmation Stage
· The customer provides the drawings/samples and the order quantity(MOQ500)
· The technical team conducts drawing/sample analysis to confirm processing details such as dimensions, materials, and precision
· The quotation will be provided within two working days.
2. Sample Production Phase
· After confirming the quotation and product details, start making sample.
3. Mass Production Phase
· After the samples are confirmed, a formal contract will be signed (50% of the purchase price needs to be prepaid).
4. Delivery and Acceptance Stage
· Quality Inspection and Delivery
· Customer Acceptance
Processing and manufacturing services provided by FTM
CNC Turning、Milling、Drilling、Tapping、Boring、Grinding processing (internal cylindrical grinding processing, external cylindrical grinding processing、internal and external raceway grinding processing, surface grinding processing, double-end face grinding processing、center-less grinding processing、super-finishing processing)、wire-electrode cutting、heat treatment、and various other shape machining service.

English
中文简体
عربى
Download Catalog